MIURA - EH SeriesEH (Oil/Gas fired) Main Features
|
MIURA - EI SeriesEI (Oil fired / Gas fired) Main Features
|
MIURA - CZI SeriesCZI (Oil fired / Gas fired) Main Features
|
New Multiple Installation SystemThe MI System is a multiple installation system for obtaining maximum Performance from MIURA boilers. The operating efficiency of the entire System is improved by operating only the boilers required, with automatic back up, should a boiler go off line. The system be flexibly expanded simply by adding additional units, up to a maximum of 15. |
Flexible Design System
|
||
|
||
Advance Control SequenceBoilers are automatically turned on and off to match steam demand to ensure high system efficiency. |
||
|
||
Save Energy & SpaceMiura Boiler's MI-System, in combination with the MI-Controller, has been developed to save energy, money and space. Conventional firetube systems result in wasted radiation loses because of constant firing. The Miura boiler will make full steam within 5 minutes making it easy to tie boilers in a multiple installation to act as one large boiler. When large load swing occur, only those on line .The result is fuel saving and waste reductions.
|
|
94, Jalan 24/2, Taman Megah,
47301 Petaling Jaya,
Selangor D.E. MALAYSIA
No. 3, Jalan Sungai Batu 8/KU6,
Taman Perindustrian Klang Utama,
42100 Klang,
Selangor D.E. MALAYSIA
+603-7804 5555 (Office)
+6019-388 5026
/ WhatsApp
+603-7804 0555 (Fax)
inmech@inmech.com